Available now: raw, untreated silica quartz sand from the Al-Qaryatayn mine — bagged FOB Port of Tartus, or loaded loose onto your trucks at the mine. Submit a Letter of Intent
INVEST

Stage 1: a silica treatment facility. Open to investment.

Syria Silicon is open to investment of around USD 35 million for Stage 1: a facility to wash, grade, dry and bag the Al-Qaryatayn silica quartz sand for export through the Port of Tartus. The plan, subject to closing the investment, is to establish the Syrian Silicon City in stages, beginning with this treatment facility in 2027–2028. Further stages depend on what the silica purity reveals on the ground.

Data Room

Investors with an access code can open the document library: executive summary, presentation, feasibility study, market and technical studies and the financial model.

No code yet? Request access.

~USD 35MStage 1 investment sought: treatment facility, truck fleet, site works and working capital
~900,000 t/yrPlanned saleable output at full capacity, from about one million tonnes of raw feed
2027–2028Planned construction and first production, subject to closing the investment
99.4%Best SiO₂ of 17 samples tested at ALS; range 95.6–99.4%

Stage 1 in pictures

The deposit

The deposit

Clean white silica quartz sand at Al-Qaryatayn, Homs Governorate, dug directly with no drilling or blasting. The central block has been quantified by the General Directorate of Geology and Mineral Resources at about 100 million tonnes.

The sand

The sand

17 samples tested at the independent laboratory ALS: SiO₂ 95.6–99.4%, best 99.4%; Fe₂O₃ 0.05–0.14%. Product specifications are built on measured results only.

The facility

The facility

Washing, attrition, screening, drying and bagging at about 130–150 tonnes per hour, with water recycled. Illustrative vendor layout of a plant of this type.

The product

The product

Washed, graded and dried silica sand in one-tonne bags, exported FOB Port of Tartus to glass, foundry, construction and filtration buyers.

Typical layout of a washing, classification and drying plant of the kind planned for Stage 1 (vendor illustration; the final design will follow the engineering study).
Typical layout of a washing, classification and drying plant of the kind planned for Stage 1 (vendor illustration; the final design will follow the engineering study).

From mine to port

1MineAl-Qaryatayn, Homs Governorate: extraction and trucking
2Treatment facilityPlanned at Hassia Industrial City: wash, grade, dry, bag
3Port of TartusBags loaded, independent inspection, export
4BuyersGlass, foundry, construction and filtration plants worldwide

What is offered

  • A minority economic interest in the operating company for investors who fund the Stage 1 cash requirement. Syria Silicon retains the majority and contributes the study mandate and approvals, the land programme, the supply relationship, management and the technical team.
  • Two sand-supply arrangements for the investor to choose between: payment at loading, or credit from the mine in exchange for a shareholding taken from the Syria Silicon side. The investor's interest is the same under both.
  • Investor protections in a shareholders' agreement: reserved matters, board representation, distribution policy, audit and information rights, pre-emption and transfer provisions, an offshore holding company and international arbitration.
  • The full terms, the financial model and the returns under each option are in the Data Room.

Evidence behind the numbers

Deposit

Central block quantified by the General Directorate of Geology and Mineral Resources.

Chemistry

17 samples tested at the independent laboratory ALS; product specifications match measured results only.

Facility

Vendor-quoted wash and classification line from a European supplier, with allowances for drying, bagging, civil works and a truck fleet.

Prices

Published regional assessments and the company's own price cases; written buyer offers are a condition of financial close.

Model

A ten-year, formula-driven financial model in which every unconfirmed input is flagged, with the document that closes it.

How to proceed

1

Request access

Send a short note through the contact form or to info@syriasilicon.com. Qualified parties receive the access code.

2

Review the Data Room

Executive summary, investor presentation, feasibility study, market and technical studies and the financial model.

3

Discussion and site visit

Meeting with management, questions on the model, and a visit to Al-Qaryatayn.

4

Term sheet

Choice of supply option, shareholders' agreement terms and conditions precedent to financial close.

Team

Nawras AlaliFounder and Chief Executive Officer
Dr Mohammed AllanDirector of Geological Studies and Mining
Suresh NiepalTechnical and Technology Advisor
Joudat Al AliLegal Liaison
Mu'taz Abd al-Karim Muhib al-DinProcurement and Business Development

Talk to us about Stage 1

Access to the Data Room is by code, issued to qualified parties. Documents are confidential and for evaluation only.